A bathroom in a Belsize Park flat was stripped out and rebuilt to a high standard. In a flat, a bathroom has to be completely watertight to protect the neighbours below, so waterproofing was at the centre of the work.
Project facts
- Location: Buckland Crescent, Belsize Park, London NW3
- Property: flat
- Work: bathroom remodelling and refurbishment
- Services: refurbishment
Scope of works
Strip-out
- Strip-out and removal of the existing WC
Plumbing and waterproofing
- New plumbing
- Tanking and waterproofing
Build and finishes
- New floor
- New stud wall
- Painting and decorating
What mattered on this project
- Waterproofing before finishes. Tanking under tiles and around showers protects the building fabric and the flat below. It is the part of a bathroom you never see and the one that matters most.
- Working in a flat. Water shut-offs, noise and access were planned around the other residents.